ISM Manufacturing PMI November 2026: 15:00 UK Time on 1 December
ISM is due to publish its November 2026 manufacturing PMI at 15:00 UK time on 1 December, after October's 55.5. How it works and how nine versus bands settle.
versus Editorial · 17 November 2026
The Institute for Supply Management (ISM) is due to publish its Manufacturing PMI for November 2026 at 10:00 a.m. New York time on Tuesday 1 December 2026, which is 15:00 UK time (GMT); the latest figure, for October, was 55.5, up from 54.5 in September. At 12:50 UK time on 17 November 2026 the versus page on a November reading from 55.0 to 55.9, the band that holds October's figure, showed 29.8p for Yes, the market's estimate of a 29.8% chance.
This guide to a US survey is for readers in Great Britain and is neither advice nor a forecast; every fact was checked at its primary source on 17 November 2026.
Why the report lands at 15:00 in the UK
ISM's release calendar lists Tuesday 1 December at 10:00 a.m., the first business day of the month, and the October report names that slot for the November figure. New York left daylight saving time on 1 November (NIST) and the UK returned to GMT on 25 October, so 10:00 in New York is 15:00 in London, the same minute the nine versus pages give as their end date. Two US government releases share it: October job openings (BLS schedule) and October construction spending (Census calendar). Neither settles an ISM prediction; the job openings predictions are in our jobs report guide.
October's 55.5, taken apart
ISM's October report, issued at 15:00 UK time (GMT) on Monday 2 November by Susan Spence, who chairs its Manufacturing Business Survey Committee, said factory activity grew for a 10th month in a row. The headline combines five indexes with equal weights, ISM says, and all five were above 50:
- New Orders: 55.5 (September: 55.3)
- Production: 59.0 (56.7)
- Employment: 52.4 (52.7)
- Supplier Deliveries: 59.1 (59.0)
- Inventories: 51.4 (48.6)
Our own calculation, run at 12:17 UK time on 17 November 2026: 55.5 plus 59.0 plus 52.4 plus 59.1 plus 51.4 makes 277.4, and 277.4 divided by 5 is 55.48, which rounds to the published 55.5. Each component therefore counts for a fifth of the headline. The Prices index (75.2, after 77.9) is in the same table but not in the headline; our October ISM guide has more on that report.
What the survey asks, and when
ISM, a supply chain association dating from 1915, compiles the PMI from its own panel, so it is not a government statistic. Each month, purchasing and supply managers in 18 manufacturing industries, weighted by each industry's share of GDP, compare new orders, output, staffing and more at their US operations with the month before: higher, the same or lower. ISM turns each question into a diffusion index by adding the percentage answering higher to half the percentage answering the same. Above 50, it reads manufacturing as generally expanding; below 50, as generally contracting. Supplier Deliveries is the exception, rising when deliveries slow. ISM says raw answers are never changed, though seasonal adjustment of four of the five components can shift slightly once a year. The survey goes out early each month and most replies come late in it, so, on ISM's account, November's replies are still arriving. The rules call the source the Report On Business, ISM's former name for its PMI Reports.
Nine bands on the November figure
Each band is a Yes or No prediction on the headline in ISM's November 2026 report, read as the number printed to one decimal place (ISM writes "55.5 percent"; the rules treat that as 55.5), with both ends of each one-point band included. Together the nine cover every possible reading, so exactly one can match. If ISM misses 1 December, all nine stay open until its next scheduled report; if November is still absent then, the latest earlier month ISM has published counts, which as things stand would be October's 55.5. At 12:50 UK time on 17 November 2026 the pages showed these prices for Yes:
- Below 52.0: 5.5p
- 52.0 to 52.9: 3.9p
- 53.0 to 53.9: 10.2p
- 54.0 to 54.9: 30.2p
- 55.0 to 55.9: 29.8p
- 56.0 to 56.9: 17.6p
- 57.0 to 57.9: 3.4p
- 58.0 to 58.9: 1.7p
- 59.0 or above: 2.5p
Each band is a separate prediction, so the prices need not add up to 100p (how to read market probabilities).
The last 12 readings, band by band
The October report lists the past 12 months: 48.0 and 47.9 for November and December 2025, then 52.6, 52.4, 52.7, 52.7, 54.0, 53.3, 55.6, 54.6, 54.5 and 55.5 for January to October 2026. Sorted into the nine bands (our own count, run at 12:17 UK time on 17 November 2026), two fall below 52.0, both under 50; four in 52.0 to 52.9; one in 53.0 to 53.9; three in 54.0 to 54.9; and two in 55.0 to 55.9. None reached 56.0. That is a record of the past year, not a guide to November.
What settles the nine, and what does not
- Tuesday 1 December, 15:00 UK time (GMT): ISM's November report. The band holding its figure answers Yes and the other eight No.
- Thursday 3, Friday 4 and Wednesday 9 December: ISM's November Services PMI, a separate survey (15:00 UK time on the 3rd, ISM calendar), the November jobs report (13:30 UK time on the 4th, BLS schedule) and the Federal Reserve's decision after its 8 and 9 December meeting (19:00 UK time on the 9th, Fed calendar; see our Fed guide). None of them settles the nine. All three times are GMT.
- Early January 2027: ISM's report with December's figure, on the second business day under ISM's January rule: Tuesday 5 January by our own count, as New Year's Day falls on a Friday (ISM's calendar page lists 2026 only). It matters here only if November's report is still missing then.
Before you trade
A winning contract settles at 100p and a losing one at 0p, so you can lose the whole amount you put into a position. versus adds a transaction fee of 2% of the stake on top, shown before you confirm, and while a prediction is open you can sell at the current price. versus is licensed by the UK Gambling Commission under account 101143 (public register), and Safer Play offers deposit limits, loss limits, reality checks, time outs and self exclusion.
Frequently asked questions
What time is the ISM manufacturing PMI released in the UK?
The November 2026 report is due at 15:00 UK time (GMT) on Tuesday 1 December, 10:00 a.m. in New York. ISM releases it on the first business day of each month, or the second in January.
What was the ISM manufacturing PMI for October 2026?
55.5, in ISM's report of 2 November 2026: a point above September's 54.5, with all five headline components above 50.
What does the ISM manufacturing PMI measure?
Whether activity at US manufacturers grew or shrank on the month, according to ISM's survey of purchasing and supply executives. It averages five indexes, and 50 separates growth from contraction.
18+ only. Trade responsibly. BeGambleAware.org and GAMSTOP.
Predict the world’s next moves.
enter versus™More from
pulse

Quito Mayoral Election 2026: Polling Day, UK Times and Predictions
20 November 2026

Louisiana House Runoffs 2026: Who Is on the 12 December Ballot
20 November 2026

ISM PMI October 2026: Manufacturing 55.5, Services 54.5
27 October 2026

Is NuScale Going Bankrupt? Going Concern, Cash and the 2027 Prediction
11 November 2026

US PPI October 2026: Producer Prices Up 6.5% in a Year
12 November 2026

Brazil Selic Rate Decision on 9 December 2026: Copom Time in the UK
17 November 2026